« Back

News

Welcome to our news archive, a collection of our latest press releases
and announcements.

If you have general questions about anything you read here, or if you would like to be added to our news distribution list, please contact our information and communications team or submit a general enquiry.

Press enquiries should be directed to our media liaison, Susan Bouffler.

Developing a new National Flood Forecasting and Warning System for Malaysian rivers

Posted: 26-May-2017

  Continue reading ›

Supporting green river engineering

Posted: 25-May-2017

The green infrastructure (GI) network is made up of natural and semi-natural features that connect and run through our urban spaces. Rivers form a key part of this green network, and GI approaches can be used to help conserve and restore these natural features by improving water quality, morphology and natural habitats.  Continue reading ›

HR Wallingford and partners FACE up to the risks of future floods

Posted: 16-Mar-2017

In the UK and worldwide, flooding devastates homes and livelihoods, battering communities and economies. And climate change is making river and coastal flooding more frequent and more powerful. Against this increasing need to deal with the impacts of flooding, HR Wallingford has joined forces with the Environment Agency and Brunel University to embrace these challenges and train the environmentally-aware flood risk engineers of the future. Continue reading ›

HR Wallingford celebrates 70 years working with water

Posted: 07-Mar-2017

HR Wallingford is celebrating 70 years of working with water.  Founded in March 1947 in Teddington, as the Hydraulics Research Organisation, the company moved to Wallingford in 1951, to take advantage of Howbery Park’s 70 acre site and riverside location. Its large-scale tests and experiments needed lots of space and a plentiful supply of water, all of which Howbery Park could offer, including a historic Manor House which could be adapted for office use.

Even in those early days, around three quarters of the work carried out at the Hydraulics Research Organisation was focused on the prevention and reduction of flooding, the improvement of shipping channels in ports and estuaries, the damping of waves entering harbour and river mouths, and the control or slowing of coastal erosion. Work was carried out for government departments, river boards, port authorities, local authorities and consulting engineers. The organisation also undertook work for members of the Commonwealth and many other countries around the world.

One of the major projects carried out at Howbery Park in the 1970s was the construction of a massive model of a third airport for London - the proposed Maplin airport and seaport, which was to be built on 30 square miles of land reclaimed in the Thames Estuary. In 1973, a hall was custom-built to house this one model, which was all about calibrating and plotting tides and currents. At that time, the roof span of this enormous building could claim the title of the widest steel span structure in Europe.

After having been privatised in 1982, the organisation obtained Scientific Research Association status, which it still has today, meaning that 75% of its profits must be used for R&D-related activities. The company changed its name to HR Wallingford in 1991.

Although these days its scientists and engineers are more likely to be found in fleece jackets than white coats, scaled physical models are still constructed to solve water-related challenges, like the model of Colwyn Bay (on the right) being used this month to design and test the effectiveness of a coastal beach defence.  Continue reading ›

Modelling the resilience of the new beach defence at Colwyn Bay

Posted: 03-Mar-2017

HR Wallingford’s coastal engineers have created a detailed physical model of a 1.6 mile section of Colwyn Bay at a scale of 1:50 Continue reading ›

Media enquiries

Susan Bouffler

+44 (0)1491 822854

Send an email

Stay informed

News archive

Tags