Skip to main content

Secondary nav 2022

  • Equipment
  • Software
  • Training

Main navigation 2022

  • About
    • About HR Wallingford
    • Our leadership
    • Our people
    • Our impact
      • Annual report & financial statements
      • Gender pay
      • Social impact
      • Sustainability
    • Our story
    • News
    • Insight articles
    • Policies
  • Projects
  • Expertise
    • Coastal & marine sustainability
      • Coastal hazards & resilience
      • Coastal morphology & sediment dynamics
      • Dredging and sediment management
      • Marine & coastal environment
      • Ports, harbours and shipping
      • Subsea engineering
      • Waterfronts, marinas and resorts
    • Energy transition
      • Fixed offshore wind
      • Floating offshore wind
      • Liquified gas & transition fuels
      • Nuclear
      • Wave, tidal, solar & hydropower
    • Water & climate resilience
      • Dams & reservoirs
      • Freshwater environment
      • Integrated flood management
      • Surface water systems
      • Water management for climate resilient development
      • Water supply & drought resilience
  • Facilities
    • Explore our facilities
    • Ship simulation
      • Australia Ship Simulation Centre
      • UK Ship Simulation Centre
    • Physical modelling
      • Fast Flow Facility
      • Tsunami simulator
      • Volumetric flow flume
      • Wave basins
      • Wave flumes
      • Erosion rate measurement
      • Water rescue training
  • Careers
    • Careers overview
    • Working at HR Wallingford
    • Job opportunities
  • Contact
  • About
    • About HR Wallingford
    • Our leadership
    • Our people
    • Our impact
      • Annual report & financial statements
      • Gender pay
      • Social impact
      • Sustainability
    • Our story
    • News
    • Insight articles
    • Policies
  • Projects
  • Expertise
    • Coastal & marine sustainability
      • Coastal hazards & resilience
      • Coastal morphology & sediment dynamics
      • Dredging and sediment management
      • Marine & coastal environment
      • Ports, harbours and shipping
      • Subsea engineering
      • Waterfronts, marinas and resorts
    • Energy transition
      • Fixed offshore wind
      • Floating offshore wind
      • Liquified gas & transition fuels
      • Nuclear
      • Wave, tidal, solar & hydropower
    • Water & climate resilience
      • Dams & reservoirs
      • Freshwater environment
      • Integrated flood management
      • Surface water systems
      • Water management for climate resilient development
      • Water supply & drought resilience
  • Facilities
    • Explore our facilities
    • Ship simulation
      • Australia Ship Simulation Centre
      • UK Ship Simulation Centre
    • Physical modelling
      • Fast Flow Facility
      • Tsunami simulator
      • Volumetric flow flume
      • Wave basins
      • Wave flumes
      • Erosion rate measurement
      • Water rescue training
  • Careers
    • Careers overview
    • Working at HR Wallingford
    • Job opportunities
  • Contact
  1. Home >
  2. Projects >
  3. Improving access to Mesaieed Port

Improving access to Mesaieed Port

Share

HR Wallingford looked at options for the upgrade and management of the navigation channels to Mesaieed Port in Doha. We identified a number practical measures that will improve access to the port, affording real economic benefits as well as helping to ensure future demand can be met.

Located 40km from Doha, Mesaieed Industrial City is home to many large scale petrochemical and metallurgical plants, together with light industries and community areas. The area’s integral port is accessed by two long (about 40 nautical miles) outer channels and a system of inner channels. As part of the port redevelopment, Qatar Petroleum asked HR Wallingford to assess the performance of these navigation channels. We looked at how the channel network could be optimised and identified appropriate channel dimensions for safe access to larger vessels.

Applied technical expertise

We applied our knowledge and expertise to support the preparation of a feasibility study for the port redevelopment. Our activities included modelling of wave climate and flow regime, sedimentation studies, dredging studies, traffic forecasting, development of a channel capacity model, ship navigation simulation, safety and risk studies, environmental appraisal and benefit-cost analysis.

Dredging impact studies

HR Wallingford carried out environmental appraisal of the various options for channel routing, realignment and deepening, by carrying out a comprehensive environmental risk assessment. We assessed the risks posed by dredging, the disposal of dredged material and the need to comply with environmental requirements for both onshore and offshore disposal; a factor made more acute by the long sailing distance between the furthest parts of the channel system and the shore.

We assessed the environmental impact of the port development.

Delivering economic benefits

We made some practical recommendations for future upgrades to the channel system, showing how modest amounts of dredging could improve specific features of the channel geometries. The economic advantages of this were demonstrated through benefit-cost analysis. The benefits will derive from the ability to service deeper draft vessels at the port, thus enabling efficiencies in the shipment of goods and materials.

Get in touch

Ian Cruickshank

Contact

Explore more

  • All
  • Project
  • Expertise
  • News
  • Insight
  • Facility
Floating offshore platform

Tackling the technical challenges to scale up floating offshore wind

The Thames Barrier – a gateway to innovation

Screenshot of a numerical simulation of an moored hydrogen carrier ship

Designing marine facilities for hydrogen: a risky business?

Ship with wind turbines moored at a port

Developing ports for floating offshore wind is an unprecedented opportunity

Three graduates with life safety jackets on boats on Port of Felixstowe.

First-hand port experience for our ship simulation graduates

View of a red LNG tanker moored at a port

Ports can thrive in a low carbon future

View of waves crashing on modelled breakwater

Preparing ports for climate change: prevention is better than cure

The curious case of a combined physical model

Accurate scaling for huge models has layers of complexity

View of a breakwater in a physical model

The future is bright for physical modelling

Aerial view of armoured breakwater in green sea waves

Breaking with convention: do you really need a breakwater?

Sophisticated simulators contribute to safe navigation

We are global leaders and independent experts in how to live and work sustainably with water

Social media

  • BlueSky
  • LinkedIn
  • YouTube

Expertise

  • Coastal & marine
  • Energy transition
  • Water & climate
  • Software solutions
  • Equipment & technology

Company

  • About
  • Careers
  • News
  • Insights
  • Sustainability

Legal

  • Privacy & data protection
  • Policies
  • Modern slavery statement
  • Terms & conditions
  • Sitemap
© 2026 HR Wallingford
Contact