Skip to main content

Secondary nav 2022

  • Equipment
  • Software
  • Training

Main navigation 2022

  • About
    • About HR Wallingford
    • Our leadership
    • Our people
    • Our impact
      • Annual report & financial statements
      • Gender pay
      • Social impact
      • Sustainability
    • Our story
    • News
    • Insight articles
    • Policies
  • Projects
  • Expertise
    • Coastal & marine sustainability
      • Coastal hazards & resilience
      • Coastal morphology & sediment dynamics
      • Dredging and sediment management
      • Marine & coastal environment
      • Ports, harbours and shipping
      • Subsea engineering
      • Waterfronts, marinas and resorts
    • Energy transition
      • Fixed offshore wind
      • Floating offshore wind
      • Liquified gas & transition fuels
      • Nuclear
      • Wave, tidal, solar & hydropower
    • Water & climate resilience
      • Dams & reservoirs
      • Freshwater environment
      • Integrated flood management
      • Surface water systems
      • Water management for climate resilient development
      • Water supply & drought resilience
  • Facilities
    • Explore our facilities
    • Ship simulation
      • Australia Ship Simulation Centre
      • UK Ship Simulation Centre
    • Physical modelling
      • Fast Flow Facility
      • Tsunami simulator
      • Volumetric flow flume
      • Wave basins
      • Wave flumes
      • Erosion rate measurement
      • Water rescue training
  • Careers
    • Careers overview
    • Working at HR Wallingford
    • Job opportunities
  • Contact
  • About
    • About HR Wallingford
    • Our leadership
    • Our people
    • Our impact
      • Annual report & financial statements
      • Gender pay
      • Social impact
      • Sustainability
    • Our story
    • News
    • Insight articles
    • Policies
  • Projects
  • Expertise
    • Coastal & marine sustainability
      • Coastal hazards & resilience
      • Coastal morphology & sediment dynamics
      • Dredging and sediment management
      • Marine & coastal environment
      • Ports, harbours and shipping
      • Subsea engineering
      • Waterfronts, marinas and resorts
    • Energy transition
      • Fixed offshore wind
      • Floating offshore wind
      • Liquified gas & transition fuels
      • Nuclear
      • Wave, tidal, solar & hydropower
    • Water & climate resilience
      • Dams & reservoirs
      • Freshwater environment
      • Integrated flood management
      • Surface water systems
      • Water management for climate resilient development
      • Water supply & drought resilience
  • Facilities
    • Explore our facilities
    • Ship simulation
      • Australia Ship Simulation Centre
      • UK Ship Simulation Centre
    • Physical modelling
      • Fast Flow Facility
      • Tsunami simulator
      • Volumetric flow flume
      • Wave basins
      • Wave flumes
      • Erosion rate measurement
      • Water rescue training
  • Careers
    • Careers overview
    • Working at HR Wallingford
    • Job opportunities
  • Contact
  1. Home >
  2. Projects >
  3. Reservoir safety supervision for Bristol Water’s dam portfolio

Reservoir safety supervision for Bristol Water’s dam portfolio

Share

HR Wallingford provides Supervising Engineer services for Bristol Water’s 15 large raised reservoirs. Through regular inspection, data review and clear advice, we help ensure legal compliance, reduce risk to communities and protect valued water environments.

Ensuring safe reservoir management under UK legislation

In the UK, dam safety is governed by the Reservoirs Act 1975. This requires reservoir owners to appoint an independent Supervising Engineer to oversee the condition and performance of each asset, and to provide ongoing advice on safety and compliance.

Bristol Water operates 15 large raised reservoirs across the west of England. These assets are essential for water supply but also present potential risks if not carefully managed. Failure could have serious consequences for people, property and the environment downstream.

Alongside their operational role, these reservoirs are important community and environmental assets. Sites such as Chew Valley Lake and Blagdon Lake support wildlife, recreation and wellbeing.

Bristol Water needs confidence that its reservoirs are operating safely, meeting legal requirements and continuing to deliver long-term value for people and the environment.

Providing consistent, independent oversight of dam safety

HR Wallingford has delivered Supervising Engineer services for Bristol Water since 2012, providing continuity and trusted, independent advice.

We carry out six-monthly inspections of each reservoir and its associated structures. We do this to identify early signs of deterioration, assess current condition and ensure that each asset continues to perform as expected.

Alongside these inspections, we produce a comprehensive annual report for every reservoir. This brings together monitoring data, inspection findings and long-term trends. We do this to provide a clear picture of how each dam is behaving over time, helping Bristol Water make informed decisions about maintenance and investment.

We provide practical, risk-based recommendations on monitoring, maintenance and any required interventions. This ensures that actions are prioritised effectively and aligned with both safety requirements and operational needs.

Our approach focuses on long-term understanding. By combining regular inspection with data-led insight, we help identify potential issues early and reduce the likelihood of more significant problems developing.

Chew Valley Lake dam

Protecting people, supporting compliance and sustaining valued environments

This work helps Bristol Water manage its reservoirs safely, responsibly and in line with legal requirements. Regular, independent oversight reduces the risk of dam failure, helping to protect many thousands of people living downstream and providing reassurance to communities.

Clear, practical advice enables Bristol Water to meet the requirements of the Reservoirs Act 1975 with confidence, reducing the risk of enforcement action while supporting more efficient planning of maintenance and investment.

At the same time, safe and well-managed reservoirs continue to support important freshwater environments. Sites such as Chew Valley Lake and Blagdon Lake provide valuable habitats for wildlife while also offering spaces for recreation, including fishing and sailing, contributing to wellbeing and quality of life.

Together, these outcomes ensure that essential infrastructure continues to deliver lasting value for people, the environment and the wider region.

Contact our project lead

Craig Goff

Technical Director
Contact Profile

Explore more

  • All
  • Project
  • Expertise
  • News
  • Insight
  • Facility

Research shows complexity of water saved through bans

View of a dam breach experiment

Dam and levee models assessed for predicting internally initiated breaches

Drainage and Wastewater Management guidance

Rainwater Management Platform: transforming how the UK manages rainwater

SuDS-iQ: a digital environment for evaluating and planning good SuDS

View of Domenica island after hurricane damage

Water management for climate resilient development

Water resources & drought resilience

From ecosystems to insurance: nature’s role in reducing coastal flooding

Buscot Park lake: a heritage dam reinvented

Automating biodiversity impact assessments with Earth Observation

Aerial view of a meandering river

A new Environmental Destination framework

View of brown trout in river

Setting the standards for fish passes

We are global leaders and independent experts in how to live and work sustainably with water

Social media

  • BlueSky
  • LinkedIn
  • YouTube

Expertise

  • Coastal & marine
  • Energy transition
  • Water & climate
  • Software solutions
  • Equipment & technology

Company

  • About
  • Careers
  • News
  • Insights
  • Sustainability

Legal

  • Privacy & data protection
  • Policies
  • Terms & conditions
  • Sitemap
© 2026 HR Wallingford
Contact