Skip to main content

Secondary nav 2022

  • Equipment
  • Software
  • Training

Main navigation 2022

  • About
    • About HR Wallingford
    • Our leadership
    • Our people
    • Our impact
      • Annual report & financial statements
      • Gender pay
      • Social impact
      • Sustainability
    • Our story
    • News
    • Insight articles
    • Policies
  • Projects
  • Expertise
    • Coastal & marine sustainability
      • Coastal hazards & resilience
      • Coastal morphology & sediment dynamics
      • Dredging and sediment management
      • Marine & coastal environment
      • Ports, harbours and shipping
      • Subsea engineering
      • Waterfronts, marinas and resorts
    • Energy transition
      • Fixed offshore wind
      • Floating offshore wind
      • Liquified gas & transition fuels
      • Nuclear
      • Wave, tidal, solar & hydropower
    • Water & climate resilience
      • Dams & reservoirs
      • Freshwater environment
      • Integrated flood management
      • Surface water systems
      • Water management for climate resilient development
      • Water supply & drought resilience
  • Facilities
    • Explore our facilities
    • Ship simulation
      • Australia Ship Simulation Centre
      • UK Ship Simulation Centre
    • Physical modelling
      • Fast Flow Facility
      • Tsunami simulator
      • Volumetric flow flume
      • Wave basins
      • Wave flumes
      • Erosion rate measurement
      • Water rescue training
  • Careers
    • Careers overview
    • Working at HR Wallingford
    • Job opportunities
  • Contact
  • About
    • About HR Wallingford
    • Our leadership
    • Our people
    • Our impact
      • Annual report & financial statements
      • Gender pay
      • Social impact
      • Sustainability
    • Our story
    • News
    • Insight articles
    • Policies
  • Projects
  • Expertise
    • Coastal & marine sustainability
      • Coastal hazards & resilience
      • Coastal morphology & sediment dynamics
      • Dredging and sediment management
      • Marine & coastal environment
      • Ports, harbours and shipping
      • Subsea engineering
      • Waterfronts, marinas and resorts
    • Energy transition
      • Fixed offshore wind
      • Floating offshore wind
      • Liquified gas & transition fuels
      • Nuclear
      • Wave, tidal, solar & hydropower
    • Water & climate resilience
      • Dams & reservoirs
      • Freshwater environment
      • Integrated flood management
      • Surface water systems
      • Water management for climate resilient development
      • Water supply & drought resilience
  • Facilities
    • Explore our facilities
    • Ship simulation
      • Australia Ship Simulation Centre
      • UK Ship Simulation Centre
    • Physical modelling
      • Fast Flow Facility
      • Tsunami simulator
      • Volumetric flow flume
      • Wave basins
      • Wave flumes
      • Erosion rate measurement
      • Water rescue training
  • Careers
    • Careers overview
    • Working at HR Wallingford
    • Job opportunities
  • Contact
  1. Home >
  2. Projects >
  3. Thirty years working with the Port of Dover

Thirty years working with the Port of Dover

Share

HR Wallingford has been working with the Port of Dover for more than 30 years and during this time we have completed almost 40 projects. We have feasibility tested the layout and design performance of every single new berth and pier development at the Port of Dover since 1980.

Location
England

Comprehensive support

HR Wallingford has provided a valuable support to the Port of Dover developers over the past 30 years, carrying out a wide range of studies. We have undertaken a range of projects, including:

  • site visits
  • field wave measurements
  • measurements of moored ship movements
  • hydraulic desk assessments
  • breakwater and revetment designs
  • navigation simulations
  • numerical modelling
  • extensive physical modelling of operations and proposed developments.

Beaches and sediments

We used our extensive experience in coastal engineering to produce a study to understand the past evolution of a beach area near the port, and to assess its stability under present hydrodynamic conditions. We also used numerical modelling to predict sedimentation rates in the harbour with two layouts of dredged areas.

Ship simulation and navigation

We have used our ship simulation centre to develop a ship navigation simulation of the Port of Dover that has been used in a series of navigation simulation workshops to inform and support the design of the Ports’ 30 year master plan developments. HR Wallingford’s ship simulation centre houses two real-time, bridge controlled ship navigation simulators, each with state of the art visuals which are designed to be used in port design and ship operations applications. It provides an established and flexible port design, assessment and training facility. The ship simulation centre was used to carry out a navigation simulation study to investigate the design and layout implications of manoeuvring ferries of up to 225 m in length within Dover Harbour. These ferries are the largest ferries that can be accommodated at the berths without major reconstruction.

Detailed understanding

HR Wallingford has detailed knowledge of the wave currents, sediment regime and conditions of the marine assets at the Port of Dover. This experience is combined with the Port's extensive in-house master planning and engineering knowledge.

Get in touch

Ian Cruickshank

Contact

Explore more

  • All
  • Project
  • Expertise
  • News
  • Insight
  • Facility
View of a pilot in front of two computer screens

Richer data helps Thames pilots plan safer passages

picture of white sandy Avalon beach

Modelling the burial and exposure of unexploded ordnance

View of Port Quasim

Facilitating the growth of Port Qasim

view of coral reef along coast

Insuring the benefits of nature-based solutions in the Caribbean

view of the suffolk coast in Sizewell

Sizewell C cooling water system

Greening coastal infrastructure

Greening coastal infrastructure

image of mangrove forest and underwater channel

Nature-based solutions in the Caribbean

River floods in city in Peru, South America

Early warning system helps Peru build back better

view of a flume physical model with water and instrumentation

Investigating sand-gravel beach morphodynamics to help protect coastlines

aerial view of Aberdeen port - courtesy of Aberdeen Harbour Board.

Aberdeen South Harbour: a project of national significance

aerial view of London Gateway Port

London Gateway Port

We are global leaders and independent experts in how to live and work sustainably with water

Social media

  • BlueSky
  • LinkedIn
  • YouTube

Expertise

  • Coastal & marine
  • Energy transition
  • Water & climate
  • Software solutions
  • Equipment & technology

Company

  • About
  • Careers
  • News
  • Insights
  • Sustainability

Legal

  • Privacy & data protection
  • Policies
  • Modern slavery statement
  • Terms & conditions
  • Sitemap
© 2026 HR Wallingford
Contact